Posted on

Hitachi ZAXIS 130W Wheeled Excavator Factory Service & Shop Manual

OLYMPUS DIGITAL CAMERA

Pages from WCABE00 – Hitachi ZAXIS 130W Wheeled Excavator Workshop Manual
MHITZX130WOPES.zip
Price: $29.99 USD

Complete workshop & service manual with electrical wiring diagrams for Hitachi ZAXIS 130W Wheeled Excavator. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Hitachi ZAXIS 130W Wheeled Excavator service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

FILELIST:
EMCBB31 – Hitachi ZAXIS 130W, 160W, 180W, 210W Wheeled Excavator Operator’s Manual.pdf
TTCABE00 & TTCCBE00 (attach to) – Hitachi ZAXIS 130W, 160W, 180W, 210W Electrical Circuit Diagrams.pdf
WCABE00 – Hitachi ZAXIS 130W Wheeled Excavator Workshop Manual.pdf

EXCERPT:
SECTION 1 GENERAL INFORMATION
Group 1 Precautions for disassembling and
Assembling
Group 2 Tightening Torque
Group 3 Painting
Group 4 Bleeding Air from Hydraulic Oil Tank
SECTION 2 UPPERSTRUCTURE
Group 1 Cab
Group 2 Counterweight
Group 3 Main Frame
Group 4 Pump Device
Group 5 Control Valve
Group 6 Swing Device
Group 7 Pilot Valve
Group 8 Pilot Shut-Off Valve
Group 9 Signal Control Valve
Group 10 Travel Shockless Valve
Group 11 Solenoid Valve
Group 12 Pilot Relief Valve
Group 13 Steering Valve
Group 14 Brake Valve
Group 15 Accumulator Charging Valve
Group 16 Transmission Control Valve
SECTION 3 UNDERCARRIAGE
Group 1 Swing Bearing
Group 2 Travel Motor
Group 3 Center Joint
Group 4 Transmission
Group 5 Axle
Group 6 Axle Lock Cylinder
Group 7 Operate-Check Valve
SECTION 4 FRONT ATTACHMENT
Group 1 Front Attachment
Group 2 Cylinder
Group 3 Hose-Rupture Safety Valve
Group 4 Operate-Check Valve
SECTION 5 ENGINE

UNDERCARRIAGE / Travel Motor
REMOVE AND INSTALL TRAVEL MOTOR
CAUTION: Be sure to bleed air from hydraulic oil tank before starting the work.
(Refer to “Bleeding Air from Hydraulic Oil Tank” on page W1-4-1.)
Removal
IMPORTANT: Attach identification tags to disconnected hoses to aid re-assembly.
1. Remove socket bolts (1) (8 used) and split flanges (8) (4 used) from travel motor (7). Disconnect main hoses (2) (2 used), then cap all disconnected hose ends.
2. Disconnect drain hose (4) and pilot hose (3). Cap all disconnected hose ends. : 27 mm
CAUTION: Travel Motor Weight: 85 kg (190 lb)
3. Loosen mounting socket bolts (5) (4 used) from travel motor (7), then support the lower side of travel motor (7) by a forklift. Remove socket bolts (5) (4 used).
4. Remove travel motor (7) from transmission (6).