Posted on

Caterpillar 315 & 315 L Excavators Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)


Complete workshop & service manual with electrical wiring diagrams for Caterpillar 315 & 315 L Excavators. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Caterpillar 315 & 315 L Excavators service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

MANUAL LSIT:
SENR6183 – Schematic (315 & 315 L Excavator Electrical System)
SENR6184 – Specifications (315 & 315 L Excavators Hydraulic System)
SENR6188 – Schematic (315 & 315 L Excavators Hydraulic System)
SENR6189 – Disassembly & Assembly (315, 315L, 317 & 317N Excavators Machine Systems)
SENR6251 – Disassembly & Assembly (Supplement for – 3046 Engine 315 & 315 L Excavators)
SENR8900 – Troubleshooting (315 & 315 L Excavators Hydraulic System)
SENR6155 – Systems Operation (Engine & Pump Electronic Control System for 315, 317, 32…).pdf
SENR6155 – Testing & Adjusting (Engine & Pump Electronic Control System for 315, 317, 32…).pdf
SENR6186 – Systems Operation (315 & 315 L Excavators Hydraulic System).pdf
SENR6187 – Testing & Adjusting (315 & 315 L Excavators Hydraulic Systems).pdf

EXCERPT:
5. Fasten a hoist to link assembly (4) as shown, and raise it until it is in a horizontal position.
6. Remove two nuts (6) and retaining bolt (7) from pin (8). Remove pin (8) from the link assemblies and the rod end of the bucket cylinder. Remove link assembly (4). The weight of link assembly (4) is 84 kg (185 lb).
7. Fasten a hoist to left hand link assembly (9) as shown. Remove two nuts (10) and retaining bolt (11) from pin (12). Using a hammer and punch, drive pin (12) into the stick until the left hand link assembly is free. Remove the left hand link assembly. Refasten the hoist to the right hand link assembly. Remove pin (12) from the stick and right hand link assembly. Remove the right hand link assembly.
8. Remove six lip-type seals (13) from link assembly (4).
9. Remove two bearings (14) from the open end of the link assembly with Tooling (B). Fasten Tooling (B) to the link assembly as shown. Fasten a hoist to Tooling (B) to support it; then remove the bearing. Remove the bearing on the other side of the link assembly the same way.