Posted on

Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Excavator Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)

Complete workshop & service manual with electrical wiring diagrams for Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Excavator. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Excavator service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

FILE LIST:
TOJAC-EN-00 – Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Hydraulic Excavator Technical Manual (Operational Principle).pdf
TTJAC-EN-00 (attach to) – Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Hydraulic Excavator Electrical Circuit Diagram.pdf
TTJAC-EN-00 – Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Hydraulic Excavator Technical Manual (Troubleshooting).pdf
WJAC-EN-00 – Hitachi ZX470-5G, ZX470LC-5G, ZX470H-5G, ZX470LCH-5G, ZX470R-5G, ZX470LCR-5G Hydraulic Excavator Workshop Manual.pdf

TOTAL PAGES: 1,747
LANGUAGE: ENGLISH
FORMAT: PDF

EXCERPT:
SECTION 3 UPPERSTRUCTURE
Group 9 Control Valve
Disassembly of Load Check Valve (p)
45. Remove cap (71) from housing (1).
l: 14 mm
46. Remove check valve (72), spring (48), and check valve (49) from housing (1).
47. Remove O-ring (19) and backup ring (47) from cap
(71).
Disassembly of Bypass Shut-Out Valve (q)
48. Remove cap (65) from housing (1).
j: 46 mm
49. Remove spool (69) and spring (68) from housing (1).
50. Remove piston (64), cap (66), and O-ring (67) from cap (65).
j: 46 mm
51. Remove O-ring (67) from cap (66).
52. Remove cap (44) from housing (1).
j: 46 mm
53. Remove O-ring (45) from cap (44).
54. Remove socket bolts (38) (12 used).
l: 12 mm
55. Remove flanges (36) (3 used) from housing (1).
Remove O-rings