Posted on

Hitachi ZAXIS 210W/220W Wheeled Excavator Factory Service & Shop Manual


Pages from Hitachi ZX210W Wheeled Excavator Workshop Manual

MHITZX210W220WOPES.zip
Price: $29.99 USD

Complete workshop & service manual with electrical wiring diagrams for Hitachi ZAXIS 210W-3, ZAXIS 220W-3 Wheeled Excavator. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Hitachi ZAXIS 210W-3, ZAXIS 220W-3 Wheeled Excavator service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

FILELIST:
TTCJBE00 – Hitachi ZAXIS 210W-3, 220W-3 Wheeled Excavator Technical Manual (Troubleshooting).pdf
Hitachi ZX210W Wheeled Excavator Workshop Manual.pdf
TOCJBE00SP – ZX210W-3, ZX220W-3 Wheeled Excavator Technical Manual (Operational Principle).pdf
WCJBE00SP – Hitachi ZX210W-3, ZX220W-3 Hydraulic Excavator Workshop Manual.pdf
TOCJBE00 – Hitachi ZAXIS 210W-3, 220W-3 Wheeled Excavator Technical Manual (Operational Principle).pdf
WCJBE00 – Hitachi ZX 210W-3, 220W-3 Hydraulic Excavator Workshop Manual.pdf
TTCJBE00SP – Hitachi ZX210W-3, ZX220W-3 Wheeled Excavator Technical Manual (Troubleshooting).pdf
TTCDBE00 – Hitachi ZAXIS 210W Wheeled Excavator Technical Manual (Troubleshooting).pdf
TTCJBE00 (attach to) – Hitachi ZAXIS 140W-3, 170W-3, 190W-3, 210W-3, 220W-3 Electrical Wiring Diagram
EM4GB11 – Hitachi ZX220, 250, 310 Wheel Loader Operator’s Manual.pdf
EMCBBENOP31 – Hitachi ZAXIS 210W Scrap Handling Attachment Operator’s Manual.pdf

EXCERPT:
UNDERCARRIAGE / Swing Bearing
REMOVE AND INSTALL SWING BEARING
Before removing the swing bearing, the upperstructure must be removed first. For removal and installation of the upperstructure, refer to “Remove and Install Main Frame” section.
In this section, the procedure starts on the premise that the upperstructure has already been removed.
Removal
1. Put mating marks on inner race (1) of swing bearing (4) and chassis (2).