Posted on

Caterpillar 988K Wheel Loader Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)



Complete workshop & service manual with electrical wiring diagrams for Caterpillar 988K Wheel Loader. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

Caterpillar 988K Wheel Loader service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

2,006 pages, bookmarked, Searchable, Printable, high quality PDF

FILE LIST:
KENR6486 – Disassembly and Assembly (836K Landfill Compactor, 834K Wheel Dozer and 988K Wheel Loader C18 Engine Supplement)
KENR6487 – Specifications (988K Wheel Loader Systems)
KENR6488 – Systems Operation (988K Wheel Loader)
KENR6488 – Testing and Adjusting (988K Wheel Loader)
KENR6490 – Disassembly and Assembly (836K Landfill Compactor, 834K Wheel Dozer and 988K Wheel Loader Power Train)
KENR6720 – Disassembly and Assembly (988K Wheel Loader, 834K Wheel Dozer and 836K Compactor Machine Systems)
RENR5397 – Specifications (988H, 988K, 990H, 990K, 992G, 992K, 993K, and 994K Wheel Loaders, and 854K Wheel Dozers Automatic Lubrication System (Hydraulic Actuated System)
RENR5397 – Systems Operation (988H, 988K, 990H, 990K, 992G, 992K, 993K, and 994K Wheel Loaders, and 854K Wheel Dozers Automatic Lubrication System (Hydraulic Actuated System)
RENR5397 – Testing and Adjusting (988H, 988K, 990H, 990K, 992G, 992K, 993K, and 994K Wheel Loaders, and 854K Wheel Dozers Automatic Lubrication System (Hydraulic Actuated System)
UENR3228 – Schematic (988K Wheel Loader Hydraulic System).pdf
UENR3875 – Schematic (988K Wheel Loader Electrical System).pdf
UENR7640 – Schematic (988K Wheel Loader (Steel Mill Option) Electrical System).pdf

EXCERPT:
Brake Accumulator
(1) Nitrogen charging valve. (2) Accumulator. (3) Nitrogen gas charge. (4) Piston. (5) Seal kit. (6) Pressure oil chamber. (7) Outlet to the service brake control valve.
Piston (4) moves up and down inside the bore of each accumulator (2). Nitrogen gas charge (3) has a charge of approximately 5520 kPa (800 psi). Each accumulator is charged with nitrogen through charging valve (1).
Oil enters pressure oil chamber (6) from the brake pump. The oil reaches the pressure oil chamber through outlet port (7). The oil pushes piston (4) upward. The pressure of the oil compresses the nitrogen gas.
When the pressure in the accumulator reaches approximately 14973 ± 345 kPa (2172 ± 50 psi) for the 834K and the 988K or when the accumulator reaches approximately 14485 ± 345 kPa (2100 ± 50 psi) for the 836K, the supply of oil is stopped. When either brake pedal is pushed, oil from pressure oil chamber (6) flows out of port (7) to the service brake control valve. This action applies the service brakes.

Posted on

New Holland Wheel Loader W270, W270B Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)



Complete workshop & service manual with electrical wiring diagrams for New Holland Wheel Loader W270, W270B. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This New Holland Wheel Loader W270, W270B service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

1,258 pages, bookmarked, Searchable, Printable, high quality PDF
604.07.229.50 – W190 – W230 – W270 Flat Rate Time Manual.pdf
604.13.512.01 – W270 Workshop Manual.pdf
87661531 – W270B Workshop Manual.pdf

EXCERPT:
W270B Wheel Loader
Service Manual
87661531
Table of Contents
Description Section No.
General Tab 1
Section Index – General
Standard Torque Specifications 1001
Fluids and Lubricants 1002
Metric Conversion Chart 1003
Engines Tab 2
Section Index – Engines
Engine and Radiator Removal and Installation 2000
Aftercooler 2003
Fuel System Tab 3
Section Index – Fuel System
For Fuel System Repair, See the Engine Service Manual
Electrical Tab 4
Section Index – Electrical
Removal and Installation of Starter and Alternator 4001
Electrical Specifications and Troubleshooting 4002
Batteries 4003
Instrument Cluster 4005
Steering Tab 5
Section Index – Steering
Removal and Installation of Steering Components 5001
Steering Specifications, Pressure Checks, and Troubleshooting 5002
Steering Cylinders 5005
Center Pivot 5006
Auxiliary Steering Motor and Pump 5007
Power Train Tab 6
Section Index – Power Train
Removal and Installation of Power Train Components 6001
Transmission Specifications, Pressure Checks, and Troubleshooting 6002
Transmission 6003
Front and Rear Axle 6004
Drive Shafts, Center Bearing, and Universal Joints 6005
Wheels and Tires 6006
Transmission Control Valve 6007
Brakes Tab 7
Section Index – Brakes
Removal and Installation of Brake Components 7001
Hydraulic Brake Troubleshooting 7002
Brake Accumulators 7004
Parking Brake 7008
Hydraulics Tab 8
Section Index – Hydraulics
Removal and Installation of Hydraulic Components 8001
Hydraulic Specifications, Troubleshooting, and Pressure Checks 8002
Cleaning the Hydraulic System 8003
Hydraulic Pump 8004
Loader Control Valve 8005
Cylinders 8006
Pilot Pressure Accumulator and Ride Control Accumulator 8013
Ride Control Valve 8014
Mounted Equipment Tab 9
Section Index – Mounted Equipment
Air Conditioning Troubleshooting and System Checks For Systems with HFC-134a Refrigerant 9002
Air Conditioner System Service 9003
Removal and Installation of Air Conditioning and Heater Components 9004
Loader 9006
ROPS Cab and ROPS Canpoy 9007
Cab Glass Installation 9010
Electrical Schematic Foldouts and Hydraulic Schematic Foldout In Rear Pocket

Disassembly
STEP 1
Remove all dirt, oil, and grease from the exterior of the equipment pump.
STEP 2
Put alignment marks on the end cover and housing.

Posted on

New Holland Wheel Loader W230 Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)

Complete workshop & service manual with electrical wiring diagrams for New Holland Wheel Loader W230. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

New Holland Wheel Loader W230 service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

364 + 87 pages, bookmarked, Searchable, Printable, high quality PDF
FILELIST:
604.07.229.50 – Flat Rate Time Manual W190 – W230 – W270.pdf
604.13.507.00 – W230 Wheel Loader Workshop Manual.pdf

EXCERPT:
SUMMARY
SAFETY RULES…. pag. 1
TECHNICAL FEATURES OF WHEELED LOADER W230 EVOLUTION …. pag. 8
TABLE OF FLUID CAPACITIES …. pag. 11
UNITS OF MEASURE USED IN THE MANUAL ….pag. 12
TORQUE TABLES….pag. 13
ENGINE …. Section 1
TRANSMISSION…. Section 2
BRAKES SYSTEM …. Section 3
STEERING SYSTEM …. Section 4
BUCKET BOOMS AND FRAME …. Section 5
EQUIPMENT HYDRAULIC SYSTEM …. Section 6
ELECTRICAL SYSTEM …. Section 7
CAB …. Section 8

EQUIPMENT HYDRAULIC SYSTEM
6.4.1 DESCRIPTION
Fig. 6-20 Pilot valve
The control system of the control valve is of a power assisted type with different levers for the functions: booms lowering/raising and bucket roll-back/dumping.
The control valve spools are actuated by hydraulic connections. The circuit pressure (30 bar) is ensured by a pressure relief valve equipped with an hydraulic accumulator.
It is possible to install, upon request, a third lever controlling a third spool of the control valve, in case it becomes necessary to mount a special type of equipment requiring a third hydraulic function.
A questo proposito, il supporto in cabina é predisposto a ricevere la terza leva di comando.
WARNING
The piloting system of the control valve is equipped with a safety device allowing its cuttingoff. Actuate the cut-off device to lock the control levers in neutral position when the equipment is not in use.
6.4.2 PILOT VALVE
The pilot valve is of a modular type and is composed of two valve assemblies connected by two screws. If the booms or the bucket lever is actuated, the plunger of the pilot valve moves to direct pressurised oil to the port of the equipment control valve selected, moving the corresponding spool.

Posted on

New Holland Wheel Loader W190/W190B Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)



Complete workshop & service manual with electrical wiring diagrams for New Holland Wheel Loader W190/W190B. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This New Holland Wheel Loader W190/W190B service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

804 + 508 + 87 pages, bookmarked, Searchable, Printable, high quality PDF
FILELIST:
604.07.229.50 – Flat Rate Time Manual W190 – W230 – W270.pdf
604.13. 502.01 – W190 Wheel Loader Workshop Manual.pdf
87614929 – W190B Wheel Loader Workshop Manual.pdf

EXCERPT:
SUMMARY
SAFETY RULES…… page 1
SPECIFICATIONS – WHEEL LOADER ….page 8
TABLE OF FLUID CAPACITIES ……page 11
UNITS OF MEASURE …..page 12
TORQUE TABLES………..page 13
ENGINE …….. Section 1
TRANSMISSION………. Section 2
BRAKE SYSTEM……… Section 3
STEERING SYSTEM ……….. Section 4
BUCKET BOOMS AND FRAME …….. Section 5
EQUIPMENT HYDRAULIC SYSTEM ……… Section 6
ELECTRICAL SYSTEM …… Section 7
CAB …… Section 8

BUCKET BOOMS AND FRAME
5.1 GENERAL DESCRIPTION
The load handling system is composed of:
– booms
– strut
– link
– bucket
– bucket cylinder
– boom cylinders
– pins
The bucket positioner device and the boom kick-out ensure an optimised efficiency of the equipment.
All pivot pins of the handling system have dust seals to prevent the entry of debris.
The three bucket pivot pins and the lower strut hinging pin are equipped with O-rings. All pivot pins are mounted with securing screws.
For the part relative to bucket and boom cylinders, please refer to Section 6 (Hydraulic system).

Posted on

New Holland Wheel Loader W170/W170B/W170TC Factory Service & Shop Manual


Download Link

INSTANT DOWNLOAD (add to cart)



Complete workshop & service manual with electrical wiring diagrams for New Holland Wheel Loader W170/W170B/W170TC. It’s the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This New Holland Wheel Loaders W170/W170B/W170TC service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

1,517 pages, bookmarked, Searchable, Printable, high quality PDF

FILE LIST:
604.07.242.50 – Flat Rate Time Manual W110 – W130 – W170.pdf
604.13.497.00 – W170, W170TC Wheel Loader Workshop Manual.pdf
87614924 – W170B Wheel Loader Workshop Manual.pdf

EXCERPT:
SUMMARY
GENERALITIES……… Section 0
ENGINE …….. Section 1
TRANSMISSION…….. Section 2
BRAKE SYSTEM……. Section 3
STEERING SYSTEM …….. Section 4
BUCKET BOOMS AND FRAME ………. Section 5
EQUIPMENT HYDRAULIC SYSTEM ………. Section 6
ELECTRICAL SYSTEM ………. Section 7
CAB ……. Section 8

Adjust Rolling Moment of Drive Pinion Bearing
STEP 50
Install the spacer ring on the pinion shaft.
Note – As per experience the required rolling movement is obtained by use of the spacer ring [e.g. s=8.70 mm (0.34 inch)] available at disassembly.
However, a later checking of the rolling movement must be done.
WARNING
Always wear heat protective gloves to prevent burning your hand when handling heated parts.
STEP 51
Insert the assembled drive pinion into the differential carrier and install the heated bearing inner ring.